TRANSFER AND INSTALLATION OF ATX-2 FOR S/E CABIMAS. Project Completed.
The transfer and installation of ATX2 for the Cabimas Sub Station, located in the Cabimas municipality, Zulia state, Venezuela, taking place in three phases: Disassembly of autotransformers and reconstruction of the ATX-2 base in the Cabimas S/E (Phase I) , Transfer of the autotransformer from the Oasis S/E, located in the state of Anzoátegui to the Cabimas S/E, located in the state in Zulia (Phase II) and Assembly and commissioning of the ATX-2 in the Cabimas S/E ( Phase III)