energy-solutions https://energy-solutions.net Company with international presence with technological services and products with high added value to solve problems associated with the handling of fluids such as corrosion, erosion, abrasion and cavilization at the service and forefront of the industry, focused on development, maintenance, protection, repair and improvement of its equipment and facilities. Wed, 21 Aug 2024 16:59:41 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.2 https://energy-solutions.net/wp-content/uploads/2024/05/favicon01-150x150.png energy-solutions https://energy-solutions.net 32 32 Thermoelectric Plant repowering https://energy-solutions.net/en/thermoelectric-plant-repowering/ Fri, 21 Jun 2024 20:29:52 +0000 https://energy-solutions.net/?p=5281

Repowering of units B4, B5, B6 and B8 of the Barquisimeto II Thermoelectric Plant and unit LM6000 of the Barquisimeto III Thermoelectric Plant of CORPOELEC, Lara State, Venezuela

The service includes the repowering and improvements of the units of the Barquisimeto II and III Thermoelectric Plant, in terms of installation of new bearings, application of general paint in the units, supply and installation of a battery bank, filters and pre-filters of intake of air and gas servovalves, disassembly, transfer, maintenance and assembly of heat exchanger. Plant located in the Industrial Zone, Barquisimeto, Lara State.

]]>
Rehabilitation and start-up of the TZ-10 unit of the Termozulia Plant https://energy-solutions.net/en/rehabilitation-and-start-up-of-the-tz-10-unit-of-the-termozulia-plant/ Fri, 21 Jun 2024 18:15:43 +0000 https://energy-solutions.net/?p=5148

We are currently working on the restoration of Unit TZ10, which includes Inspection, Cleaning, Disassembly of the turbine to carry out type “b” maintenance (hot gases), Assembly phase of the turbine and compressor area, Maintenance of auxiliary systems and equipment and Commissioning and putting into service. These activities are being carried out at the Termozulia Plant located in the La Cañada de Urdaneta Municipality, in the State of Zulia.

]]>
Picure Plant https://energy-solutions.net/en/picure-plant/ Tue, 28 May 2024 21:08:38 +0000 https://energy-solutions.net/?p=4708

Installation and Commissioning of 1 LM2500 GE Unit, with
capacity of 32 MW, in the Picure Plant, La Guaira State, Venezuela.

]]>
Cabimas Substation https://energy-solutions.net/en/cabimas-substation/ Tue, 28 May 2024 20:58:44 +0000 https://energy-solutions.net/?p=4588

Reconditioning and Maintenance of the Cabimas Substation a
230/115/34.5 KV, Cabimas, Zulia State, Venezuela.

]]>
Raisa II Thermoelectric Plant https://energy-solutions.net/en/la-raiza-ii-plant/ Tue, 28 May 2024 17:52:24 +0000 https://energy-solutions.net/?p=4541

Installation work of two GE LM2500 turbines, with an installed capacity of 64MW. Planta la Raisa, Miranda State, Vzla
Mechanical, Electrical and Instrumentation Assembly of the generation turbines and their accessories.

]]>
Transfer and Installation of ATX-2 https://energy-solutions.net/en/atx/ Sun, 28 May 2023 21:35:51 +0000 https://energy-solutions.net/?p=4832

TRANSFER AND INSTALLATION OF ATX-2 FOR S/E CABIMAS. Project Completed.

The transfer and installation of ATX2 for the Cabimas Sub Station, located in the Cabimas municipality, Zulia state, Venezuela, taking place in three phases: Disassembly of autotransformers and reconstruction of the ATX-2 base in the Cabimas S/E (Phase I) , Transfer of the autotransformer from the Oasis S/E, located in the state of Anzoátegui to the Cabimas S/E, located in the state in Zulia (Phase II) and Assembly and commissioning of the ATX-2 in the Cabimas S/E ( Phase III)

]]>
Exchangers Phase I https://energy-solutions.net/en/exchangers-phase-i/ Sat, 28 May 2022 21:51:41 +0000 https://energy-solutions.net/?p=4827

MANUFACTURE AND SUPPLY OF THE HEAT EXCHANGERS OF THE BEARINGS OF THE GENERATING UNITS OF THE SIMÓN BOLÍVAR HYDROELECTRIC PLANT, LOCATED IN GURÍ, VENEZUELA, 1ST PHASE, CORRESPONDING TO THE UNITS G1, G3 AND MACHINE HOUSE 1 AND THE GUIDE BEARING OF THE TURBINE OF UNITS G11 AND G19 OF MACHINE HOUSE 2.

Completed Project (2023)

]]>
OTHER PROJECTS https://energy-solutions.net/en/other-projects/ Fri, 28 May 2021 22:28:00 +0000 https://energy-solutions.net/?p=4938

JUAN MANUEL VALDÉZ PLANT

CONSTRUCTION, COMMISSIONING AND OPERATION OF 2 SIEMENS 5001F UNITS, WITH CAPACITY OF 180 MW, GUIRIA, SUCRE STATE.

SAN TIMOTEO PLANT

COMMISSIONING AND COMMISSIONING OF THE LMS100 GE UNIT, WITH A CAPACITY OF 100 MW, MENE GRANDE, ZULIA STATE.

CONSORCIO EL SITIO PLANT

COMMISSIONING OF SIEMENS COMBINED CYCLE UNITS, WITH CAPACITY OF 500 MW, CAPITAL DISTRICT, VENEZUELA.

TEMPRANA DE PGRU PLANT

COMMISSIONING OF GE UNITS, WITH A CAPACITY OF 25 MW FOR THE ROMA-IZGURE CONSORTIUM, ZULIA, VENEZUELA.

TERMOZULIA IV PLANT

INSTALLATION WORK OF TWO GE MS7001EA TURBINES, WITH TOTAL CAPACITY OF 160 MW. THE SCOPE OF OUR COMPANY WAS THE MECHANICAL, ELECTRICAL AND INSTRUMENTATION OF THE GENERATION TURBINES AND THEIR ACCESSORIES, ZULIA, VENEZUELA.

LAS MOROCHAS PLANT

INSTALLATION WORK OF A GE LM2500 TURBINE, WITH TOTAL CAPACITY OF 24 MW. MECHANICAL, ELECTRICAL AND INSTRUMENTATION ASSEMBLY OF THE GENERATION TURBINE AND ITS ACCESSORIES, ZULIA, VENEZUELA.

TERMOZULIA PLANT

TECHNICAL ADVICE FOR MAJOR MAINTENANCE UNIT GE 7001FA, SAN FRANCISCO, ZULIA, VENEZUELA.

PUEBLO VIEJO PLANT

MAJOR MAINTENANCE TO UNIT GE 5001, BACHAQUERO, ZULIA, VENEZUELA.

TERMOBARRANCAS PLANT

MAJOR INSPECTION – COMBINED CYCLE AT GE FRAME 7001FA, BARINAS, VENEZUELA.

TERMOZULIA I, ENELVEN

HOT GAS INSPECTION – CC. IN GE FRAME 7001FA. MARACAIBO VENEZUELA.

PETROWARAO

TRAINING FOR MAJOR INSPECTION ON GE FRAME 6000B. PEDERNALES, VENEZUELA.

PDVSA TIA JUANA PLANT

MAJOR INSPECTION AT GE FRAME 5002P, LAKE MARACAIBO, VENEZUELA

PDVSA LAGUNILLAS PLANT

COMMISSIONING AND START-UP OF A GE FRAME 5002P, LAKE MARACAIBO, VENEZUELA

TERMOBARRANCAS PLANT

INSTALLATION FOR LONG-TERM STORAGE OF GE FRAME 7001FA. BARINAS, VENEZUELA.

]]>